Skip to main content

DUST FUNNEL | Denray | Downdraft Tables

  • Description

    Now your blow-off dust can be captured into your dust collection system. Each section at 42 in. wide will provide you the desired length you need for any CNC Router configuration just by adding multiple units together

    A 42 in. section (single unit) requires 1,500 CFM for dust blown into unit

    With hinges attached, you can create a plywood bridge which will give you the opportunity to lift up to any router (pictured to the left)

    Multiple units can be set into any length; each unit requires a 5 in. intake hose

    3 sections (triple unit) provides 10.5 ft. length and 24 in. depth (with duct pipe). This combination will work for most applications routing on 8 ft. sheets

    A triple unit (10.5 ft.) requires 4,500 CFM 2 Height options available

Get Quote

Please provide the following information and a member of our team will be in touch with you shortly.